Epoxy Coating Of Cooling Towers Header Pipe

Before Coating
After Coating
Equipment Detail :
  • Cooling tower header pipe
  • Make: Paharpur
  • Total Area Covered 920 Sq.mtr
Process Details :
  • Application Procedure For Epoxy Coating of Cooling Towers Header Pipe
  • Steel Surface Preparations by Power Tool Cleaning / Hand Tool Cleaning (st3/ st2)
  • Coating/ Paint Application
  • WRTPL shall provide a Technical Data Sheet (TDS) using Product XPL-6000 LLL
  • Coating / paints are applied by brush; the brush shall be of a style and quality acceptable to the coating manufacturer. Brush application shall be done so that a smooth coat, as uniform in thickness as possible is obtained.
Application Inspection Photos After 2 years of Successful Performance